£15m for zero-emission testing at Belfast Harbour
THIS IS SO STUPID AND I LOVE IT. THE IDEA THAT BELFAST HARBOUR IS SUDDENLY GOING TO BECOME THIS LIVING, BREATHING DIGITAL ECOSYSTEM FOR ZERO-EMISSION TRANSPORT IS JUST WILD. SO, THE UK RESEARCH AND INNOVATION FUND THREW £15 MILLION AT THIS, AND NOW ARTEMIS TECHNOLOGIES IS BASICALLY BUILDING A DIGITAL TWIN OF THE WHOLE PORT. IT SOUNDS LIKE SCI-FI, RIGHT? BUT THE CEO SAYS IT IS JUST ABOUT OPTIMIZING ENERGY. LIKE, WHEN THE WIND BLOWS TOO HARD, THE NETWORK AUTOMATICALLY TELLS THE BOATS TO SIP UP THE EXTRA POWER INSTEAD OF WASTING IT. IT IS ALL ABOUT INTEGRATING ELECTRIC BOATS AND AUTONOMOUS TRANSPORT INTO A MASSIVE, SMART GRID. IT IS THE SECOND PROJECT GETTING CASH FROM THE BIGGER £30 MILLION BELFAST-DERRY INNOVATION CORRIDOR FUND. IT IS JUST SO CALM AND EFFICIENT. ANYWAY WHAT ARE YOU DOING LATER?
YOU HAVE NOT SEEN THIS ONE YET HAVE YOU? IT IS HONESTLY FASCINATING. BELFAST HARBOUR IS TURNING INTO A LIVE TESTING GROUND FOR ZERO-EMISSION GEAR BECAUSE OF A £15 MILLION INVESTMENT FROM THE UK GOVERNMENT. THEY ARE LINKING UP ELECTRIC VESSELS AND HIGH-POWER MARINE CHARGING SYSTEMS THROUGH THIS WILD DIGITAL TWIN TECHNOLOGY. IT IS NOT JUST ABOUT THE SHIPS, IT IS ABOUT THE ENERGY NETWORK. THE SYSTEM IS SMART ENOUGH TO KNOW WHEN THERE IS TOO MUCH WIND POWER AND TELLS THE BOATS TO CHARGE UP IMMEDIATELY. THEY WANT TO PROVE THIS STUFF ACTUALLY WORKS IN THE REAL WORLD TO SPEED UP ADOPTION. THIS IS ALL PART OF A BIGGER £30 MILLION POT FOR THE BELFAST-DERRY INNOVATION CORRIDOR. IT FEELS LIKE THE FUTURE JUST WALKED IN AND SAT DOWN. ANYWAY I AM CHOOSING TO BE NORMAL ABOUT IT.
Belfast Harbour is receiving £15 million in funding to test integrated zero-emission transport and energy systems through digital twin technology.
Named in this and it is not fair or not accurate? Write to us — we correct or remove within a few days.